undefined
+
  • undefined

ZJ300 Water-sealed Slag Well

The ZJ300 water-sealed slag shaft, arranged under the boiler's lower connecting box, has the main function of accidental slag storage and absorption of the expansion of the boiler's water-cooled wall. Normally, the slag well has a storage volume of not less than 4-8 hours of slag discharge under MCR conditions, and the slag well is usually supported independently; the slag well water seal tank can effectively absorb the expansion of the boiler water-cooled wall vertically and horizontally, and the water seal tank is equipped with flushing and drainage measures. When using suspended installation, no water seal tank is provided, but the expansion of the boiler is absorbed by the lower equipment.

Key word:

Product consultation:

Product description

The ZJ300 water-sealed slag shaft, arranged under the boiler's lower connecting box, has the main function of accidental slag storage and absorption of the expansion of the boiler's water-cooled wall. Normally, the slag well has a storage volume of not less than 4-8 hours of slag discharge under MCR conditions, and the slag well is usually supported independently; the slag well water seal tank can effectively absorb the expansion of the boiler water-cooled wall vertically and horizontally, and the water seal tank is equipped with flushing and drainage measures. When using suspended installation, no water seal tank is provided, but the expansion of the boiler is absorbed by the lower equipment.

 

ZJ300

 

Related products

Get product quotes for free