How to deal with the failure of Yichang chain bucket conveyor
Release time:
2021-10-12
When the pin shaft works under heavy load, it repeatedly extrudes and rubs the inner hole of the lock plate, resulting in the expansion of the inner hole of the lock plate, which can not locate the pin shaft, and the pin shaft moves freely and falls off. The pin shaft is fixed by the locking plate which is clamped into the groove at the top of the pin shaft. The locking plate is fixed on the plate chain with an M8 bolt to play the role of locking the pin shaft. So, what should I do if the chain bucket conveyor in Yichang breaks down?

When the pin shaft works under heavy load, it repeatedly extrudes and rubs the inner hole of the lock plate, resulting in the expansion of the inner hole of the lock plate, which can not locate the pin shaft, and the pin shaft moves freely and falls off. The pin shaft is fixed by the locking plate which is clamped into the groove at the top of the pin shaft. The locking plate is fixed on the plate chain with an M8 bolt to play the role of locking the pin shaft. So, what should I do if the chain bucket conveyor in Yichang breaks down? Yichang New Yiyun Machinery is summarized as follows:
1. It solves the problem that the chain bucket conveyor is prone to derailment during use, and ensures the stable operation of the unit.
2. It reduces the time of fault judgment and can take timely measures to effectively prevent the expansion of equipment fault.
The motor control circuit in the control cabinet of Yichang bucket conveyor is connected with the motor of the bucket conveyor body. The broken chain monitoring and protection device is installed at the tail of the bucket conveyor body. Two groups of guide wheel groups are installed at the lower and upper part of the climbing part of the bucket conveyor body. Two groups of guide wheel groups are located at the side of the hopper of the bucket conveyor body. Two deviation travel switches SQ1 and SQ2 are installed next to the two guide wheel groups respectively, Emergency control button SQ3 and emergency control button SQ4 are respectively installed on the frame of the horizontal part and the climbing part of the chain bucket conveyor body. The blocking detection device is installed on the blanking port of the chain bucket conveyor body, the broken chain monitoring and protection device, two deviation travel switches SQ1 and SQ2, and the emergency control button SQ3 The emergency control button SQ4 and the blocking travel switch SQ5 of the blocking detection device are connected in series in the motor control circuit of the chain bucket conveyor control cabinet.
Related news